thread-master/docs/product/opportunity-inbox/tasks/T871-precision-and-cost-eva...

56 lines
1.7 KiB
Markdown
Raw Normal View History

2026-08-13 02:22:24 +00:00
# T871 — precision and cost evaluation gate
> Status: `done`2026-08-11
> Milestone: `M7`
> Est. change: `~170 lines`
## Goal
完成後可重跑 evaluation證明 recommended 前十 precision_at_10≥0.8、high 違規為 0並記錄 AI ratio 與每筆有效商機成本 baseline。
## Depends on
- T850、T851、T860、T870
## Inputs
- `apps/backend/internal/module/radar/usecase/accuracy_fixture_test.go`
- `apps/backend/internal/module/radar/usecase/product_accuracy_test.go`(若存在)
- Plan §6.5、Spec 驗收 #23
## Outputs
### 程式變更(預期路徑)
| 路徑 | 動作 | 說明 |
|------|------|------|
| `apps/backend/internal/module/radar/usecase/opportunity_accuracy_test.go` | add/edit | precision、high hard gate、baseline comparison |
| `docs/product/opportunity-inbox/ACCURACY.md` | edit | 結果、誤判類型、成本 baseline |
| `docs/product/brand-product-radar/ACCURACY.md` | edit/ref | 與既有 T773 共用輸出 |
### 行為變更
- 未達 8/10 不得標示完成;回到召回/前處理/排序 task 調校。
### API / 契約(若有)
- evaluation 輸出 precision_at_10、high_without_required_evidence、provider_or_announcement_in_high、ai_judged_ratio、credits_per_valid_opportunity。
## Out of scope
- 不自動調整權重、不修改產品資料、不新增 P1 個人化排序。
## Acceptance
- [x] `precision_at_10 >= 0.8`、兩種 high 違規皆為 0。
- [x] 成本只建立 baseline不捏造未驗證 P0 目標。
- [ ] 指令:
```bash
cd apps/backend && go test ./internal/module/radar/usecase -run 'OpportunityAccuracy|Precision' -count=1
```
## Notes
報告要能區分「沒找到」與「找到但被前處理/預算延後」。