thread-master/docs/product/opportunity-inbox/tasks/INDEX.md

5.5 KiB
Raw Permalink Blame History

Tasks INDEX — opportunity-inbox

Plan../plan.mdapproved 2026-08-11
Spec../spec.mdapproved 2026-08-11
Statusin-progressPhase AC 與 M7 驗收資產已完成live rollout 文件同步中) Updated2026-08-11

硬規則

規則 內容
交付順序 M0 Phase A → M1/M2 Phase B frontendmock → UX 批准 → M3M6 Phase C live → M7 Phase D 品質與回歸
後端 只改 apps/backend/generate/api/*.api 後跑 make gen-api;業務只寫 internal/logic/**internal/module/**
舊系統 old/ 只讀;所有交付只在 apps/ 與本產品文件
狀態 ReviewState 與 OpportunityStatus 分離accepted 仍是 CRMcompleted 只是工作完成
去重 ownersource identity 一筆 Opportunity同來源 tombstone 不新建、不重判
扣點 review列表前處理免費provider 成功才依既有 meter 計點;有效判定唯一鍵防重扣
時間/列表 UTC unix nspage/pageSizepagination/list;排序由 server side 穩定執行
Token 會員 JWT 與 AI provider token 分離BYOK 平台 credits=0 但保留 count/source
Task 大小 每題約 100200 行 production change跨 milestone 能力需拆開

INDEX

ID Title Phase / M Kind Status Est.
T800 radar inbox contract goctl A / M0 feat done ~180
T801 frontend inbox domain repository seam A / M0 feat done ~160
T802 legacy mapping and contract guards A / M0 test done ~160
T810 single opportunity inbox shell B / M1 feat done ~180
T811 mock review state repository B / M1 feat done ~180
T812 inbox card detail and actions B / M1 feat done ~190
T813 inbox filters sorting url empty tests B / M1 test done ~180
T820 demand map mock editor B / M2 feat done ~190
T821 query plan preview mock B / M2 feat done ~150
T822 cost preview and credit confirmation mock B / M2 feat done ~170
T823 sweep funnel mock and ux gate tests B / M2 test done ~180
T830 review state domain and mapping C / M3 feat done ~180
T831 memory review audit tombstone C / M3 feat done ~190
T832 mongo review fields migration indexes C / M3 feat done ~180
T833 review state api list and compatibility C / M3 feat done ~190
T840 demand map domain repository C / M4 feat done ~190
T841 baseline version and query planner C / M4 feat done ~180
T842 cost preview quota gate C / M4 feat done ~190
T843 demand map enrichment metering byok C / M4 feat done ~190
T850 candidate normalization prefilter C / M5 feat done ~190
T851 evidence extraction priority scorer C / M5 feat done ~190
T852 judge structured result cache C / M5 feat done ~200
T853 idempotent judgment metering fixtures C / M5 test done ~180
T860 sweep pipeline demand map prefilter C / M6 feat done ~200
T861 sweep checkpoint resume budget C / M6 feat done ~190
T862 sweep funnel counters and api C / M6 feat done ~180
T863 live repository inbox integration C / M6 feat done ~190
T870 opportunity inbox accuracy dataset D / M7 test done ~160
T871 precision and cost evaluation gate D / M7 test done ~170
T872 race retry and duplicate charge regression D / M7 test done ~190
T873 compatibility rollout and gaps docs D / M7 docs done ~140

建議執行順序

T800 → T801 → T802
  → T810 → T811 → T812 → T813
  → T820 → T821 → T822 → T823
  ──【Phase B UX 批准】
  → T830 → T831 → T832 → T833
  → T840 → T841 → T842 → T843
  → T850 → T851 → T852 → T853
  → T860 → T861 → T862 → T863
  ──【P0 live 驗收】
  → T870 → T871 → T872 → T873

可並行組合

組合 收斂點
T800 ‖ T801 T802
T810 ‖ T811 T812T813
T820 ‖ T821 T822T823
T830 ‖ T831 T832
T840 ‖ T841 T842
T850 ‖ T851 T852T853
T860 ‖ T861 T862T863
T870 ‖ T871 T872T873

Spec 驗收覆蓋

Spec 場景 主要 tasks
#1#5 收件匣、完成、移除、復原、CRM 同步 T810T813、T830T833、T863
#6#7 DemandMap、QueryPlan、incomplete T820T821、T840T841、T860
#8#12 前處理、證據、排序、未知時間 T850T851、T863、T870T871
#13#15 CostPreview、0 hit、前處理排除 T822、T842、T860T862
#16#20 計點、失敗退點、續跑、ceiling、BYOK T822、T843、T852T853、T861T862、T872
#21#22 版本與重判 T841T843、T852、T872
#23#24 accuracy 與 today redirect T813、T863、T870T873

閘門

  • Task breakdown 已批准使用者已要求「全部執行」2026-08-11
  • README phase=in-progress
  • M1M2 完成後必須先取得 Phase B UX 批准,才可開始 M3。
  • M6 完成後必須通過 P0 live 驗收,才可開始 M7。
  • brand-product-radar T773T775 與 T870T873 重疊的 accuracyrace回歸輸出只實作一次完成時在兩份 INDEX 交叉引用。
  • 實作時使用者需指定單一 T### 或明確要求一批;不可把未批准的 neighbor task 順手帶入。